Search Jobs

Project Scheduler

Canonsburg, PA 15317 | Exempt Contract

Post Date: 06/27/2017 Job ID: 125564 Industry: Scheduler

DESCRIPTION:
  • Must have strong overall understanding of planning, scheduling, work breakdown structure, critical path method, earned value analysis and other methodologies used in scheduling. 
  • The lead scheduler should have strong pipeline construction background. MVP has a dedicated project controls group and needs someone who would work well in an project controls developmental environment.
  • There will be a centralized  project controls team in Pittsburgh and a field project controls team to support them when the project kicks off. 
  • Office based role with some potential expensed travel.

RESPONSIBILITIES:
  • Develops and updates cost loaded schedules. Resource loading will be done down the road.
  • Integrate multiple contractor schedules into master schedule.
  • Identifies major milestones, critical approvals and long lead procurement items.
  • Determines reasonable schedule logic and constraints based on discussion with task owners and/or teams.
  • Develops realistic activity durations based on production rates and available manpower based on discussion with task owners and/or teams.
  • Assigns resources (cost, labor or material) to activities and develops cash flow reports and resource histograms.
  • Evaluates critical and near critical path activity sequences.
  • Assesses actual progress based on site inspections.
  • Identifies schedule changes and trends.
  • Develops earned value reports.
  • Suggests corrective actions and/or develops recovery plans when delays are anticipated or occur.
  • Prepares time and cost delay claims.
  • Supports risk allocation and value engineering workshops.
  • Prepares scheduling specifications.
  • Strong understanding of Critical Path Method concepts.
  • Proficiency in Primavera (P6) and Tilos softwares (preferred).
  • Earned Value.

 

#LI-JS1

Not ready to apply?

Send an email reminder to:

Share This Job:

Related Jobs: